ONE WHITE PAPER TO MAKE BIM YOUR PRECONSTRUCTION EDGE
For project owners, engineers, contractors, and seasoned builders striving for timelines that hold steady, costs that stay predictable, and execution that runs clean
The Rebar Behind Reliable Delivery? Coherent Project Planning, Built on Quality Data
We all know what happens when planning falls out of sync:
Losely defined scope of work calls for adjustments mid-project
Design deviations emerge during the construction phase
A funding shortfall forces project operations to pause
Under-analyzed site conditions cause delays and rework
This is How Coherent Project Planning Becomes Real
With BIM leading your preconstruction phase, you're building on accurate data — and cutting the cost of chaos.
Shop Drawings Extracted From 3D Model
The rich data in the 3D model ensures shop drawings reflect precise dimensions and specifications, preventing fabrication errors and installation delays.
3D Laser Scanning
3D laser scanning enables teams to capture exact site conditions early, ensuring project plans are based on detailed, reliable data from the start.
4D Scheduling
4D Scheduling is the ultimate tool for validating project planning coherence as it allows for construction sequencing simulations that identify schedule conflicts early.
5D Cost Estimation
Through the integration of construction costs with the virtual BIM model, project stakeholders are able to adjust the cost estimation in real-time, avoiding last-minute changes to the budget.
Ready for an in-depth look at how BIM empowers preconstruction? Download the full white paper and take control of your projects today!
Your information is safe with us
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
About VEC
VEC is a constantly growing business cooperating with leading engineers, designers and contractors, with vast expertise in BIM, virtual design, and construction technologies. Since the foundation, we have delivered over 500+ nationwide projects. And with about 250 BIM virtual construction experts, our company is among the United States’ most experienced BIM and VDC vendors. That allows us to assist customers in designing, building, and managing projects more effectively, leverage BIM advantages, and ensure the proper project lifecycle.
250
+
Employees in 6 offices
500
+
Projects
15
+
Years of experience
100
+
Trusted companies
The White Paper, in its Own Words
The preconstruction phase is critical to the success of any construction project, as it is during this phase that the project scope, schedule, and budget are established.
The United States is among the pioneers in BIM development and implementation.
While BIM requires a higher initial investment, it reduces project timelines and costs by more than 50% in the long run.